Completed Projects  

List of Ongoing Projects : 

List of Completed Projects : 

S.No. Title Client name State
1 Geotechnical Investigation for Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (design Km 45+760 to Km 63+530) design length 17.77 km in the State of Meghalaya on EPC Mode under JICA loan Assistance (Package-IV) SS Infrazone Meghalaya
2 Pakcage IV-Improvement to 2 Lane with paved shoulder of NH-40 section from Km 131+820 to Km 151+330 (Design Km 45+760 to Km 63+530) design length 17.77 Km in the state of Meghalaya on EPC Mode with JICA Loan Assistance. Plate Load test at 9 Locations. SS Infrazone Meghalaya
3 Geo-technical Investigation between Rae Bareli-Akbarganj in Uttar Pradesh for New Railway Line. Innovato Solutions Uttar Pradesh
4 Sub soil investigation for Proposed Construction work of Girl’s Hostel in Campus of Kasturba girl’s school, Gola Gorakhpur in Uttar Pradesh- UP Avas Vikas Parishad UPAVP Uttar Pradesh
5 Soil Investigation for Overhead Tank at FSIP BHEL Jagdishpur, Uttar Pradesh-Bharat Heavy Electronics Limited BHEL Uttar Pradesh
6 Consultancy services for Detail Design including Survey for Construction of Minor bridge of Span 3X12 m Span, Approach Road and protection work at Kot Dariyamu Marg on Sasur Khaderi River in district Fatehpur under financial year 2020-21. UP PWD Uttar Pradesh
7 Survey and Geotechnical Investigation for Jal Jeevan Mission in Lakhimpur District (covered 100 Gram Panchayats) Integral University Uttar Pradesh
8 Sub Soil Exploration and sample collection at Chainage 74.2 km and 64.2 km in Mehmoodpur, Sitapur (UP) Integral University Uttar Pradesh
9 Geotechnical Investigation for Construction of 1 ROB & 3 Flyovers of National Highway No 730 at the section fom Km 133+230 to Km 134+330 Km 134+550 Km 135+650 Km 136+200 to Km 137+800 in the state of Uttar Pradesh (approxx. 3.800Km) Cartel Constriction Services Uttar Pradesh
10 Geotechnical Investigation for proposed “Development of six lane access control Greenfield Highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojjna from design chainage 56+500 (Vill-Karaunda Mahajan) to Design chainage 82+000(Vill-khyavari) in the State of Uttar Pradesh on EPC Mode(Package III) Cartel Constriction Services Uttar Pradesh
11 Geotechnical Investigation for Construction of 6- Lane ROB at km 314.385 over existing NH-24 of Bareilly– Sitapur section on EPC basis in the State of Uttar Pradesh for proposed private railway siding of KFL Work order for Geotechnical Investigation Work in Distt- Shahjahanpur. Cartel Constriction Services Uttar Pradesh
12 Geotechnical Investigation of Railway Line in Bolangir District, Odisha Odra Associates Pvt. LTd Odisha
13 Survey work for Construction of 2 lane ROB at Km 1207/12-13 near Anji Sahbad Railway Station on Moradabad-Lucknow Section M/s Parmanand Adwani Uttar Pradesh
14 Conducting Topographical Survey at 3 locations in the state of Jharkhand: Mangalghat/Rajmahal, Samdaghat, Singhidalan/Rajmahal KITCO Jharkhand
15 Conducting Topographical Survey at 23 locations in the state of west Bengal KITCO West Bengal
16 JKCCL Panna District – Carryout Final Location Survey (FLS) work for the proposed Greenfield Railway Project taking off from Devendra Nagar Station as Y-connectivity under Jabalpur division of West Central Railway BARSYL Madhya Pradesh
17 Geotechnical Investigation-Consultancy Services for Preparation of feasibility study and Detailed Project Report for Construction of NH-133 from Ekchari to Mahagama Almondz Global Jharkahnd
18 Survey Work on Shahjahanpur Project-Lipulek Bhind Road Shahjahanpur SS Infrazone Uttar Pradesh
19 Construction of 2 lane with paved Shoulder including geometric improvement from km 16+000 to 32+500 of stretch Tarku-Ravangla of NH-510 on EPC basis under SARDP-NE Phase "A" in the state of Sikkim-Work Order for Non Destructive Test of Structures S&P Infrastructure Sikkim